Minimum connection forest worksheet StatMedAnalysis | 24 November 2026 Instructions List every available connection once. The calculator orders edges by cost and accepts an edge only when it joins previously disconnected groups. If the input network is disconnected, the result is a forest with multiple components, not a completed connection plan. Review the selected links and the component count before reporting a total. Equal costs can permit several equally optimal trees. An optimum under these inputs does not establish real-world feasibility, resilience or capacity; those requirements need separate constraints and review. Use synthetic or aggregate values only. Record the original version before making changes. Duplicate blank fields as needed. Node dictionary : ____________________ Allowed edges : ____________________ Cost units : ____________________ Selected links : ____________________ Component count : ____________________ Feasibility review : ____________________ Example (hypothetical, not your result) Hypothetical example: four nodes have edges 0–1 costing 1, 1–2 costing 2, 0–2 costing 4 and 2–3 costing 3. The minimum tree selects costs 1,2,3 for a total of 6. The cost-4 edge would close a cycle and is omitted. Remove the only edge to node 3 and the output becomes two components with total selected cost 3. Reporting only that smaller total would hide the disconnected node. Decision and justification: ____________________ Unresolved limitation / next action: ____________________ Completed by / date / version: ____________________